Español

 

Guyana


Trinidad
& Tobago




Very usefull links



PW
Bookstore





News links

AP

AFP

Aljazeera

Dow Jones

Oil price

Reuters

Bloomberg

Views and News
from
Norway

 

 

 

Argentina launched $2bn gas pipeline tender

Mercopress

The first segment of the pipeline is expected to be completed before the onset of the southern hemisphere
winter in 2021.

By Argus

BUENO AIRES
Petroleumworld 08 01 2019

Argentina launched a tender to build and operate a $2bn natural gas pipeline to meet the demands of rising production from the Vaca Muerta shale formation.

The first 570km stage of the new line will transport a minimum of 15mn m3/d from Tratayen in Neuquen province to Salliquelo in Buenos Aires province and is expected to cost around $800mn. The pipeline capacity could eventually expand to as much as 40mn m3/d.

The first segment of the pipeline is expected to be completed before the onset of the southern hemisphere winter in 2021. The second leg will span 470km from Salliquelo to San Nicolas in Buenos Aires province and would be completed by late 2024.

The pipeline will allow Argentina to slash LNG imports through its Escobar terminal in Buenos Aires province, saving as much as $240mn per year, according to economy ministry estimates.

Argentina had two LNG import terminals until October, when it released a floating storage and regasification unit (FSRU) at Bahia Blanca, Buenos Aires province, which now hosts the country's first LNG export terminal .

The pipeline project is designed to overcome midstream bottlenecks that have hampered development of Vaca Muerta. Some producers, including state-controlled YPF, have been forced shut in some production because of the logistical constraints.

"The pipeline will allow us to improve the country's trade balance and increase production in Vaca Muerta," energy secretary Gustavo Lopetegui said.

There are currently three pipelines that transport gas from Vaca Muerta: 1,121km Centro Oeste operated by Transportadora de Gas del Norte, and Neuba 1 and 2, both running around 2,000km and operated by Transportadora de Gas del Sur. All three are saturated because of rising supply.

Argentina's gas production increased 5pc in the first six months of the year, compared to the same period of 2018, to 133.586mn m3/d.

The winner of the contract will operate the line for 35 years with the possibility of extending it for an additional 10. For the first 17 years, it will be able to operate under a special system that will allow it to freely negotiate fees with producers rather than be tied to a fixed rate.

Offers will be opened on 12 September and the final award is expected in mid-October.

The winning bidder will have 18 months to complete construction. If all goes according to schedule, the first stage of the line should be ready by April 2018, shortly before wintertime demand kicks in.



Story from Argus Media

argusmedia.com/ 07 31 2019

________________________


We invite you to join us as a sponsor.

Circulated Videos, Articles, Opinions and Reports which carry your name and brand are used to target Entrepreneurs through our site, promoting your organization’s services. The opportunity is to insert in our stories pages short attention-grabbing videos, or to publish your own feature stories.

________________________

Copyright© 1999-2019 Petroleumworld or respective author or news agency. All rights reserved.

We welcome the use of Petroleumworld™ (PW) stories by anyone provided it mentions Petroleumworld.com as the source.

Other stories you have to get authorization by its authors. Internet web links to http://www.petroleumworld.com are appreciated.

Petroleumworld welcomes your feedback and comments, share your thoughts on this article, your feedback is important to us!

We invite all our readers to share with us
their views and comments about this article.

Write to editor@petroleumworld.com

By using this link, you agree to allow PW
to publish your comments on our letters page.

Any question or suggestions,
please write to: editor@petroleumworld.com

Best Viewed with IE 5.01+ Windows NT 4.0, '95,
'98,ME,XP, Vista, Windows 7,8,10 +/ 800x600 pixels

Twitter: @petroleumworld1


 

 

TOP

Contact: editor@petroleumworld.com,

Editor & Publisher: Elio Ohep/
Contact Email: editor@petroleumworld.com

CopyRight © 1999-2019, Paul Ohep F. - All Rights Reserved. Legal Information

PW in Top 100 Energy Sites

CopyRight©1999-2019, Petroleumworld   / Elio Ohep - All rights reserved


This site is a public free site and it contains copyrighted material the use of which has not always been specifically authorized by the copyright owner.We are making such material available in our efforts to advance understanding of business, environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe this constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have chosen to view the included information for research, information, and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/107.shtml. If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission fromPetroleumworld or the copyright owner of the material.